top of page
home__aff7dfbe_1080p.mp4

Welcome to the Flight Readiness Network.

OPERATIONAL TODAY

Mobile Thermal Vacuum

ISO 8 cleanroom · +120 to −160 °C · < 5E-5 Torr

Atomic Oxygen

8" DIA coupon · 10¹⁶ atoms/cm²·s · 3–5 eV

Solar_VUV.png

Vacuum UV

8" DIA / sun · <2×10⁻⁷ Torr · 165–1800 nm

Automated Spacecraft Fueling

0–225 kg/hr · 5–300 kg · <1% accuracy · RAFTI

We provide the facilities, partners, and data to test your space systems for flight.

Three space system test services today, more launching to the Flight Readiness Network soon.

Every system can be fixed, modular, or mobile to fit your timeline.

home__42eb63ba_1080p.mp4

SpaceRig Engagement Process

A six-stage technical workflow designed for rapid space flight readiness.

Stage 2: Scope & Quote

SpaceRig estimate returned within 48 hours.

NRE time is priced up front for transparency and rapid decision-making.

Stage 3: Campaign Readiness Review

Upon contract signature: assign technical liaison to your campaign, SpaceRig Customer Working Session(s) to finalize requirements, and lock the test matrix.

Stage 4: Mobilize

Delivery scheduling: hardware ships to a hub, or SpaceRig system deploys to customer site.

Stage 5: Campaign

'OK to go' timestamped, campaign commences, rapid data dashboards throughout, and SpaceRig SME available throughout campaign and conclusion.

Stage 6: Close & Return

Hardware removed, test report at conclusion, and persistent customer data portal supported.

Stage 1: Discovery

Enter your campaign requirements and site parameters to initiate a test workflow.

What sets SpaceRig apart

Today’s Option

Vs. With SpaceRig

Inflexible forecasted schedule requirement
01_today_inflexible-schedule.png

Traditional facilities can be bottlenecked requiring long term scheduling with little opportunity for programmatic change.

Straight forward pricing and scheduling
03_spacerig_schedule-on-your-terms.png

Our systems deploy for your spacecraft and your schedule.

Build test capability in-house

Test facility construction and staff inflates program cost.

04_today_build-in-house.png
As needed campaign services
06_spacerig_shared-fleet.png

Test campaigns or short term dry leases with our SpaceRig fleet. We maintaining the network so you don’t have to.

Assemble heritage data, campaign by campaign
07_today_heritage-data-by-campaign.png
One nexus, one secure data layer
09_spacerig_one-nexus-one-layer.png

Your data is rarely comparable across test facilities and archives.

Test heritage data available for design updates and anomaly resolution.

home__eb9983c3_720p.mp4

Get Started

Tell us what you need to qualify and when. Whether it's a single coupon exposure campaign, or a spacecraft-level test, or a pre-launch fueling campaign, start with your plan and your date.

“What's different today is that the demand for satellite capabilities is growing very rapidly... SpaceRig is going to increase the cadence of our ability to build those satellites.”

- Kevin O'Connell, CEO of Space Economy Rising

bottom of page