Three Services Available Today.
Delivered to Fit Your Preference.
By the Campaign
Short-term, mission-specific tests with full technical support.
By the Season
Extended operational access for seasonal launch windows and testing cycles.
EQUIPMENT PURCHASE
Standard or customized systems integrated directly into your infrastructure, with access to our digital data network.
Mobile Thermal Vacuum

A thermal vacuum chamber residing in a 20-foot container, transportable anywhere in North America.
It is the first fully mobile, ESPA-class sized TVAC chamber.
AO & VUV Testing
SpaceRig mimics LEO and VLEO exposure with atomic oxygen and vacuum ultraviolet testing, with our university partner facilities.
These facilities have test heritage from The Aerospace Corporation, Boeing, SpaceX and Blue Origin.

Propellant Loading
Rapid, automated loading and draining for hydrazine-family propellants, built for responsive pre-launch operations and deployable to your facility or your launch site.

Capability Specs
Flow Rate: 0–225 kg/hr
High-precision automated loading for hydrazine-family propellants, supporting rapid mission readiness cycles.
Load Range: 5–300 kg
Scalable capacity for various mission profiles, from small satellite payloads to large launch vehicle stages.
Accuracy: <1% at 5kg
High-accuracy measurement and control systems ensuring mission-critical fueling data integrity.
RAFTI Compatible
Full integration with the RAFTI interface for standardized, automated qualification data reporting.
Deployable Containerized Products
Environmental testing, fueling, and AIT in transportable nodes that upgrades a spaceport's test capability when it is needed.
Details to be announced.

Assembly & Integration
Deployable containerized nodes for spacecraft integration and environmental qualification at your site.

Fueling & Propulsion
Automated propellant loading and fueling units designed for rapid, high-accuracy hydrazine-family loading.

Digital Twin Unit
Integrated digital twin and HIL/SIL nodes for real-time monitoring and data streaming to your campaign dashboards.
We are building the infrastructure for the next generation of space testing.
Join our waitlist to secure your access to the Flight Readiness Network!
Our Planned Full AIT Suite
Tell us what you need and when, and it goes into your build plan.

Thermal vacuum
Available now · mobile and fixed

fueling & Propulsion
Fueling available now & hot-fire planned Q3 2027

Atomic oxygen
Available now · with partner labs

Solar & vacuum UV
Available now · with partner labs

Cleanroom assembly, integration & test
Modular AIT centers · coming in 2028

Vibration & shock
Planned Q2 2027

Electromagnetic compatibility
Planned Q4 2027

Radiation & electronics screening
coming in 2028

Arcjet & plasma
coming in 2029
What we are building next.
A look ahead to our systems under development.